Willkommen bei EESyst!
 

Download und Veröffentlichungen



Fertigstellung FRT
Fertigstellung FRT für Container
Fertigstellung FRT Container von Delta 2020-03-23_de_RaKl.pdf (335.55KB)
Fertigstellung FRT
Fertigstellung FRT für Container
Fertigstellung FRT Container von Delta 2020-03-23_de_RaKl.pdf (335.55KB)


FRT Tests Considering Time to Market Requirements
Today not only voltage dips are required, but also voltage swells and other requirements are also relevant.
6B_3_WIW20_129_paper_Klosse_Reiner.pdf (197.53KB)
FRT Tests Considering Time to Market Requirements
Today not only voltage dips are required, but also voltage swells and other requirements are also relevant.
6B_3_WIW20_129_paper_Klosse_Reiner.pdf (197.53KB)
High Voltage Ride Through - Challenges of a 66 kV FRT Test Equipment
High-voltage power equipment like offshore wind farms is exposed to grid faults within its supplying high-voltage power network. It is desirable to perform standardized grid code testing directly on site including all turbine components.
4C_3_WIW20_130_paper_Klosse_Rainer.pdf (261.29KB)
High Voltage Ride Through - Challenges of a 66 kV FRT Test Equipment
High-voltage power equipment like offshore wind farms is exposed to grid faults within its supplying high-voltage power network. It is desirable to perform standardized grid code testing directly on site including all turbine components.
4C_3_WIW20_130_paper_Klosse_Rainer.pdf (261.29KB)
Comparison of Different OVRT Test Benches
Results of research project OVRTuere
4C_2_WIW20_111_paper_Kaiser_Sebastian.pdf (1.51MB)
Comparison of Different OVRT Test Benches
Results of research project OVRTuere
4C_2_WIW20_111_paper_Kaiser_Sebastian.pdf (1.51MB)
Transformer Based FRT Test Unit Becomes Common
Experience of 3 medium voltage FRT test system, Generic Model
WIW19-231_paper_Transformer Based FRT Test Unit Becomes Common_Rainer-Klosse_Vers2019-09-26.pdf (1.76MB)
Transformer Based FRT Test Unit Becomes Common
Experience of 3 medium voltage FRT test system, Generic Model
WIW19-231_paper_Transformer Based FRT Test Unit Becomes Common_Rainer-Klosse_Vers2019-09-26.pdf (1.76MB)
Improved Procedures for Determining Harmonics
Improved Procedures for Determining Harmonics
5C_2_WIW19_208_paper_Ziemann_Larissa.pdf (615.47KB)
Improved Procedures for Determining Harmonics
Improved Procedures for Determining Harmonics
5C_2_WIW19_208_paper_Ziemann_Larissa.pdf (615.47KB)


Windenergie und Verbrauch rücken näher zusammen
Retorfit für alte Windenergieanlagen via Line Converter zur Direkteinspeisung in Firmen Netz
Pressemitteilung LIneinverter 2020-05-05de.pdf (291.23KB)
Windenergie und Verbrauch rücken näher zusammen
Retorfit für alte Windenergieanlagen via Line Converter zur Direkteinspeisung in Firmen Netz
Pressemitteilung LIneinverter 2020-05-05de.pdf (291.23KB)